Washington Street Bridge Gateway

Petersburg, Virginia

The Washington Street Bridge was selected for the community’s gateway because over 88,000 vehicles pass under it each day and it is the primary route to downtown Petersburg from Interstate 95. The city has a long history of wrought iron architectural work going back to the seventeenth century. The arch design presents a modern interpretation of an historic wrought iron fence pattern. Dramatic night lighting and a framing landscape complete the transformative composition.

Project Role: Prime Consultant
Project Size: 20,000 S.F.
Project Cost: $1.6 M
Completed: 2018
Client: The Cameron Foundation

© Chroma Design. All rights reserved.     2020 B Pearl Street, Boulder, CO 303-938-9900     Powered by outsource IT